
01Building & civil engineering · Zimbabwe
Drawnprecisely.
02The ground
Ground thathas never beenmeasured.0.000 m
Setting out is the first physical act of construction — the moment a drawing stops being paper and becomes marks on the earth. Pegs, string lines, a datum. Before it there is an idea; after it there is a building.
- Method
- Measured before construction
- Datum
- Established on site
- Geometry
- Confirmed from the drawing
03Setting out
Lines
on the ground.
Five marks, in the order a real gang would peg them.
Set out
String lines from the datum peg. Every corner squared before a spade touches the ground.
Dimension
Diagonals checked at 21.095 m. If the diagonals disagree, the building disagrees with the drawing for the rest of its life.
Peg
Six corners and a datum. The drawing now exists on the earth.
Excavate
Trenches to firm ground. Spoil to the high side, clear of the next trade.
Slab
150 mm C25/30 on 250 micron DPM, mesh A193 top. The first thing here that will still be here in fifty years.
starts to rise.
04Rise
Substructure
first.
Then
the frame.
Walls
follow.
The envelope
closes.
The drawing
disappears.
The building begins below sight: datum, excavation, footing and slab.
Columns rise from the grid. The ring beam closes the structural frame.
Masonry follows the same lines that were pegged into the ground.
Openings, glazing and roof complete the weather-tight envelope.
Then the drawing disappears. The completed work takes its place.
The work remains.
The drawing has done its job. What is left is the building: occupied, useful and ready to be handed over.
05Selected work
The work,
drawn.
From our own sites: setting out, structure, envelope, services and completed space.
Structure in progress
Envelope & glazing
Electrical services
Completed fit-out
05End of set
Your sheet
next.
Bring the drawing. We will set it out, build it, and photograph it for the set.
Start a project↗06Capabilities
Four disciplines,
one contractor.
The four disciplines, shown in the order a project meets them.

Building construction
From setting out and substructure through envelope, finishes and handover.

Civil works
Ground, access, drainage, hardstanding and the work every structure depends on.

Electrical works
Containment, distribution, lighting, power and coordinated first fix.

Renovations & maintenance
Existing spaces measured honestly, rebuilt carefully and returned to use.
07Proof
What the work
already proves.
No speculative totals and no invented project claims. Four promises the finished portfolio has to keep.
- 0401 / 04
Disciplines under one name
Building construction, renovations, electrical works and civil works.
- 0102 / 04
Accountable contractor
One coordinated path from the first line on the ground to final handover.
- A→Z03 / 04
Ground to completion
Measurement, construction, finishes and a building ready for use — one process.
- ZW04 / 04
Rooted close to the work
Grounded in a Zimbabwean material and landscape context.
08Handover
Build it
once.
Bring the site, the drawing or the problem. Upgrade Projects will take it from the first line to a completed handover.








